Menu Menu

James Controls

Project List

Ammonia Gas Injection for NOx Reduction

Instrument Specifications, Control Valve Sizing and Supply

Central Power Station Baghouse

Systems Engineering included AllenBradley PLC with Panelview HMI, Instrumentation Specifications & Supply

CO Boiler Safety Instrumented System (SIS)

Triconex triple redundant PLCs, panel design, field instrument specs and wiring, commissioning and startup

Coke Baghouse Controls

Complete instrumentation and system engineering package included redundant Modicon PLCs and CITECT HMI

Coker Wet Gas Compressor SIS

New Triconex safety shutdown PLC, new Bentley Nevada system, Wonderware HMI, new UPS, 480V feeds

Furf and PDA Heater SIS

Replaced existing relay system with triple redundant Triconex PLCs, field panel design

HRSG Modifications

Instrumentation and controls upgrade included new scanners and igniters

Refinery Gas Turbine

Modicon PLC / Wonderware Programming and Networking

Refinery Heater SIS

Systems Integration of HIMA Logic Solver and Wonderware HMI, panel design, commissioning and startup.

Refinery Heater SIS

Emerson DeltaV Logic Solver, LOPA, SRS, SIL calcs, instrument and valve specs, installation package, panel design, new RIE, operating and maintenance procedures, commissioning and startup

Refinery Heater SIS

Triconex Trident Logic Solver,  Wonderware  HMI, Instrument and valve specs, Vendor drawing review, complete installation package, panel design, commissioning and startup.

Wet Gas Scrubber for Refinery FCC

P&ID Development, Instrument Specifications, Control Valve Sizing, Instrument Supply, Vibration Analysis Supply